Wednesday, June 19, 2013
Tirana-Elbasan tunnel, 11 thousand vehicles passed in 24 hours
Only 24 hours from the inauguration, we have Krraba tunnel passes 11 thousand vehicles.
From sallla control except Krraba tunnel, according to the monitoring functions of the tunnel and the number of vehicle records. Through a special system regjsitrohet number of vehicles going through the tunnel and the type of vehicle that passes by size.
This shows that the tunnel from Elbasan to Tirana have moved nearly 5,500 vehicles from Tirana to Elbasan while nearly 5 thousand vehicles. 500 means more have arrived in Tirana.
Movement of the tunnel pushom not in any second. And numerous are those who stop to make photos
Monitoring is carried out through a tunnel of high technology the same in EU countries.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment